Municipal Applications - Monthly Job, July 2002
Job Description:
Sewer bypass at Cincinnati, Ohio, Hamilton County Park
Pumping System:
A paved bike path with a 42 inch collector sewer beneath it began to cave in last month due to poor sub-surface conditions. Godwin 12-inch Dri-Prime pumps and 8-inch Dri-Prime pumps are being utilized to divert a peak flow of 17,000 gpm while a resolution to the situation is being analyzed.
Municipal Application Examples
- March 2006 - Utility Company Needs Replacement Fire Pumps
- February 2006 - City of Memphis Bypass, Tennessee
- December 2005 - Godwin Dri-Prime Backup Systems for Municipal Lift Stations
- September 2005 - Wastewater Treatment Plant Upgrade - Maine
- July 2005 - 13MGD Sewer Bypass, Virginia
- February 2005 - Lake Winnebago Freshwater Pigging Project, Oshkosh, WI
- January 2005 - Godwin Dri-Prime Pumps Keep Wastewater Treatment Plant Online During Expansion, Fishers, IN
- December 2004 - Interceptor Rehabilitation, Southeastern PA
- August 2004 - Rehabilitation of 100-Year-Old Sewer, New Jersey
- July 2004 - Sewer Bypass, Prince William County, VA
- April 2004 - Permanently Installed Sub-Prime Pump, Virginia
- October 2003 - Supplementary and Contingency Pumping, North Carolina
- July 2003 - Two Sewer Bypass Systems, Maryland
- June 2003 - Critically Silenced Dri-Primes as Lift Station Backup
- April 2003 - 221 MGD Bypass, Phoenix, AZ
- December 2002 - Sewer Line Break, San Antonio, TX
- October 2002 - Rapidan River Drought, Orange, VA
- August 2002 - Wastewater Pump Station Bypass, Allentown, PA
- July 2002, Spotlight 1 - Sewer Bypass, Cincinnati, OH
- June 2002 - Sewer Bypass, Chester, PA
- March 2002 - 58 MGD Sewer Bypass, San Antonio, TX