Municipal Applications - Monthly Job, October 2003
Job:
A North Carolina water and sewer authority initially purchased a Godwin HL10M Dri-Prime pump for a temporary bypass needed at its wastewater treatment plant. Taking advantage of the flexibility offered by the Dri-Prime pump, engineers at the authority then utilized the HL10M pump for six weeks to provide supplementary pumping during the installation of permanent pump upgrades. The HL10M also was used at the authority's raw water pumping facility as a contingency during power outages. In a separated application, two Godwin 12-inch DPC300 Dri-Prime pumps were used at the authority's treatment facility. Designed as critically silenced units, the 12-inch pumps solved the challenge of providing enough capacity to meet peak demands until a major system upgrade could be completed. As permanently installed pumps at the station were taken off line and upgraded, the DPC300 Dri-Prime pumps provided supplemental pumping capacity during high flow conditions. The customer was impressed with the reliability of the equipment as well as the service. As a result, they asked Godwin Pumps representatives to advise on a contingency plan to deal with the impact of coastal storms and hurricanes. Godwin now has contingency plans in place at seven of the authority's pump stations.
Municipal Application Examples
- March 2006 - Utility Company Needs Replacement Fire Pumps
- February 2006 - City of Memphis Bypass, Tennessee
- December 2005 - Godwin Dri-Prime Backup Systems for Municipal Lift Stations
- September 2005 - Wastewater Treatment Plant Upgrade - Maine
- July 2005 - 13MGD Sewer Bypass, Virginia
- February 2005 - Lake Winnebago Freshwater Pigging Project, Oshkosh, WI
- January 2005 - Godwin Dri-Prime Pumps Keep Wastewater Treatment Plant Online During Expansion, Fishers, IN
- December 2004 - Interceptor Rehabilitation, Southeastern PA
- August 2004 - Rehabilitation of 100-Year-Old Sewer, New Jersey
- July 2004 - Sewer Bypass, Prince William County, VA
- April 2004 - Permanently Installed Sub-Prime Pump, Virginia
- October 2003 - Supplementary and Contingency Pumping, North Carolina
- July 2003 - Two Sewer Bypass Systems, Maryland
- June 2003 - Critically Silenced Dri-Primes as Lift Station Backup
- April 2003 - 221 MGD Bypass, Phoenix, AZ
- December 2002 - Sewer Line Break, San Antonio, TX
- October 2002 - Rapidan River Drought, Orange, VA
- August 2002 - Wastewater Pump Station Bypass, Allentown, PA
- July 2002, Spotlight 1 - Sewer Bypass, Cincinnati, OH
- June 2002 - Sewer Bypass, Chester, PA
- March 2002 - 58 MGD Sewer Bypass, San Antonio, TX