Job Description:
Directional drilling to install new pipeline
Contractor:
Pate and Pate Enterprise, Inc.,
The Woodlands, TX
Pumping System:
Three Godwin CD150M Dri-Prime pumps to handle a large volume of viscous liquid. The first pump was positioned at the entry pit to pump the drilling mud to desander units for cleanup and re-use. The second pump was located at the exit pit to pump excess drilling mud to a tanker to be hauled to disposal wells. The final pump was used to remove excess drilling mud along the right of way.